Engineering geological report

The final document of the investigation: soil profile, soil parameters, groundwater and recommendations for the designer.

Licensed service · EL-845/2026
Engineering geological report

The engineering geological (geotechnical) report is the final output of the field and laboratory work. The designer sizes the foundation using the soil parameters it contains, so its structure, clarity and the justification of its values matter as much as the measurements themselves.

What an engineering geological report is

The report is a technical document made up of text, tables and drawings that describes the site geology, groundwater, soil properties and geohazards. Its key outcome is the division of the ground into engineering geological units and, for each unit, the characteristic and design values used in foundation design.

The report is not produced in isolation but as the conclusion of the investigation: its quality depends directly on where boreholes were placed, whether samples were taken without disturbance and how much laboratory testing was done. We prepare the report to the designer's technical brief and explain its findings to you and your designer.

When it is required

  • for the foundation design of buildings and structures;
  • as part of the design documentation for a building permit;
  • for refurbishment, adding storeys or strengthening an existing building;
  • when investigating the causes of structural distress;
  • to plan excavation, earthworks quantities and dewatering;
  • to assess whether a plot is suitable for development before purchase.

Report contents

SectionWhat it coversWhat the designer looks for
Introduction and work performedProject, technical brief, quantities and methodsWhether the scope suits the project
Site settingTopography, climate, man-made influencesSurface runoff, level differences
GeologyAge, origin and bedding of the soilsHow layer thickness varies across the site
HydrogeologyGroundwater level, regime and aggressivenessBasement, waterproofing, dewatering
Soil propertiesEngineering geological units and their parametersDesign values for foundation calculations
Problem soils and geohazardsMade ground, collapsible, swelling and saline soils; landslides, groundwater flooding, erosionWhether additional measures are needed
Seismic conditionsGround category by seismic propertiesInput for seismic design
Conclusions and recommendationsSummary of findingsFoundation type, bearing stratum, protective measures

Drawings and tables

  • exploratory hole location plan — boreholes, trial pits and probing points on the topographic plan;
  • geological cross-sections — how the units run between boreholes, and the groundwater level;
  • borehole logs — layer descriptions, sampling depths and water levels for each hole;
  • probing plots — soil resistance against depth;
  • laboratory summary sheets — results for each sample, oedometer and shear test plots;
  • water chemical analysis and the aggressiveness assessment.

How to read the report

  1. Find the foundation level on the cross-section and see which engineering geological unit it falls in.
  2. Check the design values for that unit: density, deformation modulus, angle of internal friction, cohesion and, for clays, the liquidity index.
  3. Check whether a weaker layer lies below foundation level — it governs the settlement calculation.
  4. Find the encountered and stabilised groundwater levels and any note on seasonal rise.
  5. Read the section on problem soils and geohazards — collapsibility, swelling, salinity, aggressiveness.
  6. Compare the recommendations with the design solution and raise questions where they differ.

What matters to the designer

  • Borehole depth. Boreholes must cover the zone of influence of the foundation; a report based on shallow holes is not adequate for deep or piled foundations.
  • Justified parameters. The number of tests should be stated for each unit; values based on only a few tests should be used with caution.
  • Date of water level readings. The level depends on the season, so the reading date and a note on seasonal variation are important.
  • Consistency with the design. If the building position, footprint or foundation depth has changed, the adequacy of the existing report must be reassessed.

How the work is carried out

  1. Preparation. Agreeing the technical brief and work programme, collecting archive data.
  2. Field work. Drilling, sampling, probing and groundwater measurement.
  3. Laboratory. Testing of soil and water samples.
  4. Office processing. Defining units, statistical processing of parameters, drawing sections, writing the text and internal checking.
  5. Handover. Issue of the report and answers to the designer's questions.

Equipment and software

  • drilling and probing rigs — to obtain field data;
  • laboratory equipment — for physical and mechanical soil tests;
  • survey instruments — to determine coordinates and levels of exploratory holes;
  • CAD and specialist geological software — for sections, logs and summary tables.

Deliverables

  • the report in PDF and signed hard copies in the agreed number;
  • drawings in DWG where required;
  • laboratory test certificates.

Timing

  • the volume of field work and borehole depth;
  • the laboratory schedule — oedometer and shear tests take longer;
  • geological complexity of the site and the presence of problem soils.

What we need from you

  • the designer's technical brief or project details: number of storeys, basement, approximate foundation depth;
  • a plan showing the building on the site and a topographic plan;
  • any previous investigation data.

What affects the price

  • the volume of field and laboratory work;
  • additional requirements for the report — seismic or hydrogeological sections, geohazard assessment.

Indicative rates are on the engineering geological survey prices page; you can send a quote request for your project.

FAQ

Frequently asked questions

How long does a report remain valid?

It depends on whether site conditions have changed and on the requirements of the designer and the relevant authorities. If filling, excavation or a change in groundwater regime has occurred, the data should be updated.

What is the difference between characteristic and design values?

The characteristic value is the statistical mean of the test results. The design value is derived from it with a reliability factor applied, and it is the design value that is used in foundation calculations.

Can you write a report based on another firm's field data?

A report relies on the field and laboratory work of the organisation that takes responsibility for its conclusions. If earlier data exists, we take it into account and optimise the scope of new work.

What if the designer has questions about the report?

Questions can be sent to us directly. We provide written clarification on the choice of parameters and on the recommendations.

What language is the report written in?

The language is agreed when the work is ordered, in line with the requirements for the design documentation. If you are working with a foreign designer, mention this in your request.

Does the report specify the foundation type?

The report recommends a foundation type and bearing stratum based on the ground conditions. The final choice and design of the foundation are the designer's responsibility.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.