Foundation soil investigation for existing buildings

Trial pits and boreholes to examine the foundation and the soils beneath an existing building — for distress, refurbishment and extra storeys.

Licensed service · EL-845/2026
Foundation soil investigation for existing buildings

When cracks appear in a building, floors start to sag or an extra storey is planned, the first question is what ground the foundation sits on and what condition that ground is in today. This investigation establishes the actual foundation dimensions, the properties of the soils beneath and the groundwater conditions.

What the investigation is and why it is needed

Unlike a greenfield site, the ground under an existing building has been carrying load for years: in places it has consolidated, elsewhere it has weakened through leaking services, a rising water table or neighbouring excavations. For many older buildings neither the design drawings nor the original site investigation survive, and the foundation type and depth can only be established by exposing it.

The investigation answers two questions: is the distress related to the bearing soils, and can the ground take additional load? With this data the structural engineer designs strengthening, checks whether an extra storey is feasible or sizes a foundation widening. The condition of the load-bearing structure is assessed by the structural engineer; our role is to provide geological data on the foundation and the ground beneath it.

When it is required

  • cracks in walls, foundations or floors, tilting of the building or signs of differential settlement;
  • adding a storey or a loft, or a change of use;
  • refurbishment, lowering a basement or building an extension;
  • persistent damp or standing water in the basement;
  • a deep excavation planned next to the building, or distress that began after one;
  • after an incident — a burst water main, flooding, signs of slope movement.

Scope of work

TaskPurposeOutput
Review of records and distressStudy the building's history, existing drawings and investigations, crack locationsPlan of trial pit and borehole locations
Trial pits against the foundationEstablish foundation type, material, depth, footing width and conditionTrial pit logs, foundation sketches, photos
Boreholes next to the buildingInvestigate the soils below foundation levelBorehole logs, geological cross-sections
Undisturbed samples from beneath the footingDetermine the properties of soil that has been under loadSamples for the laboratory
Laboratory testingDetermine physical and mechanical properties, collapsibility and swelling potentialCharacteristic and design values
Groundwater and aggressivenessAssess the water level and its effect on foundation materialsLevel readings, chemical analysis

If movement is ongoing, it makes sense to combine the investigation with settlement monitoring, which shows whether the process is continuing and at what rate.

Investigating the causes of distress

Crack pattern and location often point to the cause, but it can only be confirmed with trial pit and borehole data. The most common causes are:

  • soil wetted by leaking water and sewer pipes, with additional settlement of collapsible soils;
  • made ground or organic layers left beneath the footing;
  • seasonal swelling and shrinkage of clays;
  • a rise or fall in the groundwater level;
  • excavation on a neighbouring plot, or landslide movement on a slope;
  • parts of the building founded at different depths or on different soils.

How the work is carried out

  1. Preparation. Building walkover, recording of distress, review of documents, selection of trial pit and borehole positions; underground utilities are located.
  2. Field work. Trial pits are dug by hand or with a mini excavator, the foundation is logged and measured, undisturbed samples are taken, boreholes are drilled and water levels recorded.
  3. Laboratory. Soil and water samples are tested.
  4. Office processing. Foundation sketches and cross-sections are drawn, engineering geological units are defined and the geological causes of distress are analysed.
  5. Handover. The report is issued to the client and the structural engineer; trial pits are backfilled and compacted.

Equipment used

  • compact drilling rigs — for boreholes beside the building and in courtyards;
  • hand tools and a mini excavator — to open trial pits without damaging the foundation;
  • samplers for undisturbed samples;
  • light dynamic probe — to check changes in soil density;
  • survey instruments — to locate trial pits and boreholes relative to the building.

Deliverables

  • geotechnical report: ground conditions, engineering geological units and their properties, groundwater, conclusions on the causes of distress;
  • trial pit logs and foundation sketches — type, material, depth, footing width, condition;
  • borehole logs, cross-sections, exploratory hole location plan;
  • laboratory results and photographs;
  • recommendations for the structural engineer on ground improvement and on repairing drainage and services.

Documents are issued in PDF, drawings in DWG where needed, and hard copies by agreement.

Timing

  • the number of trial pits and boreholes, and whether work is inside or outside the building;
  • how difficult the foundation is to reach — asphalt, concrete slabs, services;
  • the volume of laboratory testing.

The exact timescale is stated in our commercial proposal.

What we need from you

  • address, year of construction, number of storeys, any drawings and previous investigations;
  • description and photos of the distress and when it was first noticed;
  • the planned works — extra storey, refurbishment, strengthening;
  • access to the exploratory hole locations and consent to break out surfacing.

What affects the price

  • number and depth of trial pits, and whether surfacing must be broken out and reinstated;
  • number and depth of boreholes;
  • laboratory testing schedule;
  • whether monitoring and a topographic survey are ordered together.

Indicative rates are on the engineering geological survey prices page; for an exact price, send a quote request.

FAQ

Frequently asked questions

Can a trial pit damage the building?

The pit is dug against the foundation with limited width and depth, and is backfilled in compacted layers afterwards. Its position and size are chosen with the condition of the building and the pattern of distress in mind.

Is a soil investigation enough to add a storey?

No. Ground data is essential, but the condition of the structure and its capacity to carry extra load are assessed by the structural engineer. Our report is the input for those calculations.

Can you pinpoint the cause of the cracks?

We substantiate ground-related causes — wetting, made ground, swelling, water table changes — with trial pit, borehole and laboratory data. Assessing structural causes is the responsibility of the structural engineer.

There is an old report for the building. Is a new investigation needed?

An old report is a valuable source, but ground conditions can change over the years. Usually the old data is taken into account and a smaller programme of new work is carried out to verify it.

Can the investigation be done inside the building?

Yes, a trial pit can be dug in the basement or on the ground floor by breaking out the floor. The scope and reinstatement are agreed in advance.

How can we tell whether movement is still going on?

Monitoring points are installed on the building and surveyed at intervals. Settlement monitoring is covered by our licence and can be ordered together with the investigation.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.