Setting-out works

Pile layout setting-out

Staking the centre of every pile from design coordinates, as-built survey of installed piles and a deviation schedule for the structural engineer.

Licensed service · EL-845/2026
Pile layout setting-out

Pile layout setting-out means marking on the ground the positions of the piles that carry a foundation on weak soils or under heavy loads. A pile field can contain dozens or even hundreds of piles, each with precise design coordinates. The surveyor sets out every point and marks it with a steel pin or timber peg so the piling rig starts exactly in the right place.

Along the Baku coastline and on sandy, water-saturated soils, high-rise buildings, bridge piers, industrial structures and tanks are frequently founded on piles. A pile installed off its design position changes the load it carries and may require the pile cap to be redesigned or even additional piles to be installed. That is why both the setting-out and the subsequent as-built survey matter.

Points are set out with a SOUTH total station or GNSS RTK from control points established around the site. Because heavy machinery often disturbs the marks, it is more efficient to work in stages that follow the progress of the piling rig. Once piles are installed, the actual centre and head level of each one is measured.

The deviation schedule is passed to the structural engineer for pile cap checks.

When you need it

  • Piled foundations of multi-storey buildings
  • Construction on coastal, weak or saturated soils
  • Foundations of bridge and overpass piers
  • Foundations of tanks and industrial equipment
  • Secant or contiguous pile walls for excavation support

What's included

  • Checking the pile plan and preparing a coordinate list
  • Installing control points around the site
  • Staking and numbering pile centres
  • Restoring disturbed marks
  • As-built survey of installed piles
  • Measuring pile head levels

How we work

  1. Receiving the pile plan and coordinates
  2. Establishing the control network
  3. Staged setting-out following the piling schedule
  4. As-built survey after piling
  5. Delivery of deviation schedule and as-built drawing

Deliverables

  • Numbered pile marks on site
  • Pile setting-out certificate
  • Pile as-built drawing (DWG, PDF)
  • Plan and level deviation schedule
FAQ

Frequently asked questions

How long does pile setting-out take?

Several dozen piles can usually be staked in a day. On large sites the work is staged to match the piling rig.

What is the permitted pile deviation?

It depends on pile type and diameter and is set by the design and applicable codes (AzDTN/SNiP); the as-built survey is compared against those limits.

Do you restore disturbed marks?

Yes. Because the control points remain in place, lost marks can be re-staked quickly.

What affects the price?

Number of piles, number of visits and whether an as-built survey is required. Use the website calculator for an estimate or call us.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.