Setting-out works

Setting out building axes

Setting out main and intermediate building axes by total station before construction starts, fixing them on batter boards or offset pegs and setting the datum level.

Licensed service · EL-845/2026
Setting out building axes

Setting out building axes is the first and most critical survey step on any construction project. The design defines the position of a building by a grid of axes, lines labelled with letters and numbers. The surveyor locates the axis intersections on the ground from the site plan coordinates and fixes them so that the marks survive excavation and builders can re-establish any axis whenever needed.

Anyone preparing to build a private house, villa, apartment block, warehouse or industrial building needs this service. If the axes are set out wrongly, the building may encroach on the neighbouring plot or the building line, and utility connections may not match. Fixing such a mistake after the foundation is cast is very expensive and sometimes impossible.

Main axes are set out with a SOUTH total station (1"–2" angular accuracy) from at least two control points and then verified by measuring diagonals and distances between axes. The axes are transferred to steel offset markers or timber batter boards placed outside the building footprint. At the same time the design datum (±0.000) is transferred by levelling to a nearby stable feature.

The work is usually completed in one day and recorded in a setting-out certificate with an axis diagram.

When you need it

  • Before starting construction of a house or villa
  • Before excavating the foundation pit of a multi-storey building
  • For foundations of warehouses and industrial buildings
  • When building an extension to an existing building
  • When axes must be re-established after excavation

What's included

  • Checking the site plan and grid layout, computing coordinates
  • Verifying or establishing control points
  • Setting out main axis intersections
  • Check measurement of diagonals and axis spacing
  • Transferring axes to batter boards or steel offset markers
  • Transferring the datum level (±0.000)

How we work

  1. Receiving design documents and preparing coordinates
  2. Site visit and connection to control points
  3. Setting out and fixing axes
  4. Check measurements
  5. Handover of certificate and diagram, showing marks to the builder

Deliverables

  • Axis marks fixed on site
  • Axis setting-out certificate
  • Marker layout diagram with coordinates
  • Datum level benchmark
FAQ

Frequently asked questions

How long does setting out building axes take?

For a private house usually a few hours, for large buildings one or two days. Documents are ready the same or next day.

How accurate is the setting-out?

Main axes set out by total station are accurate to a few millimetres and meet building code requirements.

Which documents are needed?

A site plan with the building position in coordinates, the grid layout and the foundation plan. The land title plan is also useful for checking boundaries.

What does the price depend on?

Building size, number of axes and whether control points exist. Use our website calculator for an estimate or call us.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.