Hydrogeological calculations of drainage and groundwater lowering for excavations, basements and sites, including inflow and pumping capacity.

Licensed service · EL-845/2026
Drainage and dewatering calculations

Where groundwater is shallow, the water level must be lowered temporarily or permanently to dig an excavation or keep a basement dry. It is important to calculate in advance how much water will flow in, how many wells or wellpoints are needed, the pump capacity and the effect of the system on nearby buildings. Without such calculations dewatering is either insufficient or needlessly expensive.

The calculations are based on the results of geotechnical and hydrogeological surveys, especially pumping tests. Taking into account the size of the excavation, foundation depth, aquifer thickness and permeability, we determine inflow, the drawdown curve and the required lowering. Alongside analytical methods, numerical modelling can be applied in complex conditions.

Permanent drainage systems, such as perimeter, blanket or ring drains, are designed to protect basements and foundations from groundwater over the long term. The report gives recommendations on drain pipe layout, depth, gradient and water discharge.

Lowering the water table can cause additional soil settlement and deformation of neighbouring buildings. The calculation therefore assesses the zone of influence and, where needed, recommends geodetic monitoring of nearby structures during the works. Calculations are carried out in close cooperation with the designer according to the applicable codes (AzDTN/SNiP).

When you need it

  • Excavating below the groundwater table
  • Permanent drainage of basements and underground car parks
  • When an existing basement is flooded
  • Designing flood protection for a site
  • Trenching for utilities below the water table

What's included

  • Analysis of input data
  • Calculation of inflow into the excavation
  • Drawdown curve and radius of influence
  • Number and layout of wells or wellpoints
  • Pump capacity calculation
  • Parameters of permanent drainage
  • Assessment of impact on neighbouring buildings

How we work

  1. Obtaining design and survey materials
  2. Additional pumping tests if needed
  3. Choosing the calculation scheme
  4. Calculations and comparison of options
  5. Report and advice for the designer

Deliverables

  • Hydrogeological calculation report
  • Dewatering system layout
  • Inflow and pump capacity figures
  • Drainage and monitoring recommendations
FAQ

Frequently asked questions

Can dewatering damage neighbouring buildings?

Yes, if not designed properly the soil may settle further. The calculation assesses the zone of influence and recommends monitoring where needed.

What data is needed for the calculation?

A geotechnical report, the excavation or building plan and the foundation depth. If permeability data is missing, we carry out a pumping test.

What does the price depend on?

On the size of the project, the complexity of conditions and whether extra tests are needed. Call us for details.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.