Utility route setting-out

Utility route setting-out means marking the design line of an underground or overhead network on the ground. For water mains, sewers, gas lines and power or telecom cables we stake the start and end points, angle points, manhole and chamber positions and connection points. The excavator operator digs the trench by following these marks.

The service is used by utility contractors, developers connecting new buildings to municipal networks and private clients running lines across their property. A wrongly staked route can damage an existing cable or pipe, cross onto a neighbouring plot and lead to as-built records that do not match the design. For gravity sewers the critical requirement is correct gradient: an error of a few centimetres in level can leave water standing in the pipe.

Plan points are staked with SOUTH GNSS RTK or a total station, and manhole and trench invert levels are set by levelling. On sewer lines, level marks are placed at every manhole and at intermediate points so the pipe gradient follows the design along its full length.

We also recommend an as-built survey after the pipe is laid and before the trench is backfilled.

When you need it

  • Connecting a new building to water, sewer and gas networks
  • Construction of distribution and trunk networks
  • Laying power and fibre-optic cables
  • Gravity sewer and drainage lines
  • Replacing old networks with new ones

What's included

  • Preparing coordinates of the design route
  • Staking start, end and angle points
  • Marking manholes, chambers and connection points
  • Setting trench and manhole invert levels
  • Intermediate level marks for gradient control
  • Indicating crossings with existing utilities

How we work

  1. Receiving the design and existing utility data
  2. Computing coordinates and levels
  3. Staking plan points on site
  4. Setting level marks
  5. Certificate handover and as-built survey if needed

Deliverables

  • Plan and level marks fixed along the route
  • Route setting-out certificate
  • Table of point coordinates and levels
  • Route diagram
FAQ

Frequently asked questions

Which documents are needed?

A route plan with coordinates and a longitudinal profile, especially for sewers. Technical conditions and existing network drawings are also helpful.

Can you locate existing cables and pipes too?

Yes, as a separate service we survey underground utilities with locators and show in advance where the new route crosses them.

How much route can be staked in a day?

Under normal conditions from several hundred metres to a few kilometres, depending on the number of angle points and manholes.

What does the price depend on?

Route length, number of angle points and manholes, and whether level marks are required. Use our website calculator for an estimate or call us.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.