Geohazard assessment

Identification of landslides, groundwater flooding, erosion, collapsible and swelling soils, with mitigation recommendations.

Licensed service · EL-845/2026
Geohazard assessment

On some sites the main risk is not soil bearing capacity but geological processes that develop over time: slope movement, rising groundwater, collapse of soils on wetting. Identifying them before construction allows protective measures to be built into the design in good time.

What geohazards are

Geohazards are natural or human-induced processes that can damage buildings and structures and restrict land use. Some are obvious (tension cracks on a slope, gullies); others are revealed only by investigation: soils that collapse on wetting, a gradual rise in groundwater, dissolution of salts.

The assessment aims to establish whether a process is present, how far it has developed and how construction may change it. For example, excavating a foundation pit at the toe of a slope, or irrigating the site, can reactivate a slope that appears stable.

Processes assessed

  • Landslides — downslope movement of ground; on steep slopes and where clay layers are saturated.
  • Groundwater flooding — rising groundwater wetting basements and foundation soils.
  • Erosion — removal of soil by surface water, gully growth, lateral erosion of riverbanks.
  • Coastal abrasion — wave erosion of the sea shore.
  • Debris flows (mudflows) — for sites near river channels in mountain and foothill areas.
  • Problematic soils — collapsible, swelling, saline soils and made ground.
  • Seismic effects — amplification of ground motion by site conditions, potential liquefaction of loose saturated sands during earthquakes.
  • Mud volcanism — for sites close to mud volcano structures on Absheron and in Shirvan.

How construction can change these processes

The assessment considers not only the current state of the site but also the conditions that will exist after construction. A foundation pit undercuts the toe of a slope and reduces its stability. Paving and buildings alter natural stormwater runoff, and concentrated flow can create gullies. Leaks from water and sewer networks and irrigation of landscaping raise groundwater over the years, wetting collapsible and saline soils. Recommendations in the report therefore cover both the construction period and the operation of the building.

When it is required

  • for construction on slopes, near gully edges, on riverbanks or the sea shore;
  • where cracking, tilting or damp is seen on site or in neighbouring buildings;
  • in areas with shallow or rising groundwater;
  • where loess-like, saline soils or made ground are likely;
  • for linear structures crossing complex terrain;
  • for important and multi-storey projects.

Scope of work

ActivityPurposeOutput
Review of archive data and old topographic plansidentify past occurrences and changes in terrainpreliminary hazard zoning
Reconnaissance surveyrecord tension cracks, tilted trees, seepage points, building distressmap of features and photographs
Drilling and probinglocate weak layers, the slip surface and groundwatercross-sections, groundwater levels
Geophysical surveystrace the landslide body, voids and wet zones across the sitegeophysical sections
Laboratory testingdetermine collapsibility, swelling potential, salt content, shear strengthparameters for analysis
Slope stability analysischeck stability in existing and post-construction conditionsanalysis results and mitigation recommendations

For groundwater-related risks we offer flooding risk and drainage recommendations, and for tracking movement over time, deformation and settlement monitoring.

Project stages

  1. Preparation. Collection of archive data and old plans, preparation of the work programme.
  2. Field work. Walkover, boreholes, probing, geophysical profiles, groundwater measurements.
  3. Laboratory. Tests on problematic soils, water chemical analysis.
  4. Office processing. Description of processes, stability analyses, hazard zoning.
  5. Handover. Results are delivered as a section of the engineering geological report or as a separate assessment.

Equipment used

  • drilling and probing rigs — to investigate the ground profile;
  • electrical resistivity and seismic survey equipment — to trace landslide bodies and wet zones;
  • GNSS receivers, total stations, UAVs — to survey terrain and signs of movement;
  • laboratory equipment — for shear, collapsibility and swelling tests.

Deliverables

  • description of identified processes and their stage of development;
  • hazard zoning plan;
  • slope stability analysis results (where required);
  • mitigation recommendations: drainage, surface water control, retaining structures, foundation solutions, monitoring.

Protective structures are designed by the design consultant, for whom the report provides input data. Documents are delivered as PDF and in hard copy, drawings in DWG on request.

Timeline

  • site size and type of process;
  • number of boreholes and geophysical profiles;
  • whether stability analyses are required.

Information we need from you

  • site address and topographic plan (if available);
  • photographs of any observed signs;
  • details of planned construction and earthworks.

What affects the price

  • site size and terrain complexity;
  • volume of drilling, probing and geophysics;
  • scope of laboratory testing and need for analyses.

Indicative rates are on the prices page; for an exact estimate, request a quote.

FAQ

Frequently asked questions

How can I tell if my site is at risk of landslides?

Warning signs include cracks and steps on the slope, tilted trees and poles, deformed fences and roads, and seepage at the toe. Even without such signs, an expert assessment is advisable before building near a steep slope.

Can I build a basement where groundwater flooding is a risk?

In some cases yes, but it requires waterproofing and drainage and increases construction cost. Whether a basement makes sense is assessed once the groundwater level and its seasonal fluctuation have been studied.

What if collapsible soils are found?

Collapsibility is determined in the laboratory and stated in the report. The designer then selects a solution such as compaction or replacement of the soil, piled foundations or surface water control.

Are geohazards assessed in every investigation?

Yes, the engineering geological report includes conclusions on geohazards at the site. On complex sites, such as landslide slopes, additional work and analyses are needed and are included in the work programme separately.

Can the process be monitored after construction?

Yes. Movement of buildings and slopes is tracked by geodetic methods, and groundwater levels through observation wells. The monitoring programme is tailored to the type of risk.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.