Topoqraf.az logo Topoqraf.az logo
Mine surveying

Mine development plan

Graphic part of the mine development plan for the next period, based on an as-is survey of the quarry: bench positions, production volumes and sections.

Mine development plan

A mine development plan defines where, in what volume and in what sequence work will be carried out in the quarry over the next period, usually one year. It is one of the key documents for organising production, allocating machinery and personnel, and submitting reports to the relevant authorities, and its accuracy depends directly on the quality of the mine survey materials.

Work starts with a survey of the actual state of the pit at the end of the period. Then, taking into account the approved design, the licence boundaries, reserve estimates and the production programme of the client, we draw the planned bench positions, haul roads, stripping and production areas and the location of waste dumps. Volumes for each stage are calculated as the difference between digital terrain models.

We prepare the survey and graphic part of the development plan: plans, cross-sections and volume tables. The text, technological and safety sections are compiled together with the mining specialists of the client. When the plan is compared with the actual survey every year, the development of the quarry stays transparent and under control.

When you need it

  • Preparing the production programme for the next year
  • Submitting reporting documents to the relevant authorities
  • Starting a new area or level
  • Planning machinery and resources
  • Expanding the quarry or changing the licence area

What's included

  • As-is survey of the quarry
  • Analysis of the design and licence boundaries
  • Planned positions of benches and roads
  • Stripping and production volume calculations
  • Drawing plans and cross-sections
  • Comparison of actual and planned states

How we work

  1. Receiving input data and the production programme
  2. As-is survey
  3. Modelling planned works and volume calculations
  4. Agreeing graphic materials with the client
  5. Delivery of final documents

Deliverables

  • Graphic part of the development plan (DWG, PDF)
  • Typical cross-sections
  • Volume tables by stage
  • Digital terrain model of the as-is survey
FAQ

Frequently asked questions

Do you prepare the entire development plan?

We prepare the survey and graphic part of the plan: the survey, plans, sections and volume calculations. Technological and safety sections are compiled together with the mining specialists of the client.

What period does the plan cover?

Usually one year, although a shorter or longer period can be considered at the request of the client.

What does the price depend on?

On the size of the quarry, the condition of existing survey materials and the level of detail required. Call us for details.

Order this service

Tell us briefly about the site and the job — we will confirm the price and timing.

Our specialist will contact you shortly.

You may also like

Contact us for new projects. Our professional team is always by your side!

whatsapp-avatar
Topoqraf Typically replies within 1 hour
Topoqraf.azOnline consultation
Hello! Write your question and our specialist will reply shortly.